The reason stale price sheets circulate for years is that nothing in a WhatsApp group carries a date. A file forwarded eleven times looks identical to the one issued yesterday, and the first anyone knows is when a buyer is quoted a price that no longer exists.
| Asset | Issued | Status | Note |
|---|---|---|---|
| Price sheet | 27 September 2026 | Current | Dated, and the only one we stand behind |
| Payment schedules, all three floors | 27 September 2026 | Current | Every instalment, with running totals |
| Availability | 27 September 2026 | Current | Updated as units are booked |
| Approval letter | — | Not issued | Awaiting the scan |
| Signed submission drawings | — | Not issued | Awaiting the stamped set |
| Front elevation | 1 December 2025 | Current | Preliminary design drawing |
| Floor plan and room schedule | 1 December 2025 | Current | Preliminary design drawing |
| Site photographs | — | Not issued | Monthly, once construction is logged |
| Printable brochure | — | Not issued | Will match this website exactly |
How to use this
- Before a meeting, open this page and check the issue date against whatever is on your phone.
- If they differ, use this one and delete the other. Do not keep both.
- Send buyers a link rather than a file. A link cannot go stale in their gallery, and it lets them read the registry themselves, which closes more than a PDF does.
On the elevation and the plan
The front elevation and the floor plan on this site are the architect's drawings, captioned with the sheet number, the practice that produced them and the date they were issued. They are labelled preliminary wherever they appear, because that is what the set says of itself.
Present them as what they are. Do not describe the elevation as a photograph of the building, and do not quote a room size without saying it is a preliminary dimension — the pages themselves say so, and a client who notices you skipping that will wonder what else you skipped.
Once construction starts, the construction log is the stronger asset. A dated photograph of real work beats a drawing, in a market where every competitor has images and almost none have evidence.